1.jpg 3.jpg 4.jpg 5.jpg 6.jpg

Update and formulation of the Final Water Supply study for Pefka, Asvestochori and Eksohi areas from the Meteora water-tank

Client:
Thessaloniki Water Supply and Sewerage S.A.
Timeframe:
07/06/2002 - 03/09/2003
Description:

The object of this project was the study of additional reservoirs, pumping stations and pipelines not included in the original Study, the architectural design of all tanks and pumping stations, primary and supplementary, the structural design of all tanks and additional pumping stations , the electromechanical study of additional reservoirs and pumping stations, land survey of additional works, the cost - benefit analysis of works, the environmental study of works, the geotechnical study and the drafting of the tender.

Budget:
375.098 euro
Area of Study:
Thessaloniki, Greece